Skip to content

Welcome to XLG SWISS. The company is currently being incorporated; registration in the commercial register is expected in November 2026.

XLG SWISS
Lucyna Gorges at a standing table overlooking the factory hall

Guide

Insights on lean, processes and change.

Lean in practice

9 of 13 articles

Waiting pallet at a closed dispatch door next to a wall calendarLean in practice

Delivery date promised, delivery date missed. What is really behind it

The customer calls, the date is gone, production gets the call. Yet the date was already lost before the first chip fell. Where delivery reliability actually comes from.
Dusty suggestion box on a pillar in a production hall with a form half postedLean in practice

The suggestion box is where good ideas die

Your people have ideas. They write them down, post them and never hear of them again. After the third time, they stop. That is how a plant loses its most valuable source of improvement.
Dusty pallet with a faded label between new pallets in the high-bay rackingLean in practice

Your warehouse tells you the truth about your processes

Inventory is a frozen decision. Every shelf, every buffer stock, every piece of dead stock tells you where a process is not working. You only have to be able to read what it says.
Two workers at a handover board at shift change, one hand pointing at a status cardLean in practice

The ten minutes of shift handover that shape a whole shift

One shift leaves, the other arrives, in between a handshake and half a sentence. What is lost in these minutes, the night shift never makes up. How to design a handover that holds.
Well-maintained KPI board in a production hall that employees walk pastLean in practice

The board is up, the numbers are right, nobody looks

Every week the board is updated, and every week the shift walks straight past it. A board nobody stands in front of is wallpaper. What it lacks is not a better KPI.
New machining centre standing idle, raw material waiting beside itLean in practice

The most expensive machine in the hall stands still the most

The new machine was supposed to solve everything. Now it stands still more than it runs, and nobody can say why. Usually it is not the machine but everything that happens around it.
Yellowed laminated work instruction on a machine, working hands in the backgroundLean in practice

A standard is not a sheet of paper, it is the best known way of working

Laminated instructions hang everywhere, and yet every shift does it differently. The fault lies not with the people, but with the understanding of what a standard is.
Three similar shopfloor boards from three plants as a triptychLean in practice

Three plants, one standard? Why copying does not work

In the lead plant, lean works; in the other plants it stays on paper. Why copying standards fails and how to transfer the principle instead of the template.
Unread KPI report next to a hand-kept tally sheetLean in practice

KPIs nobody reads, and the one that changes everything

The KPIs hang on the board, the behaviour in the hall stays the same. Why that is, and how OEE, lead time and delivery performance become tools that teams use to steer themselves.
Lucyna Gorges facilitating a lean workshop in the obeya room of a large plant

Would you rather discuss your initiative than keep reading?