Skip to content
XLG SWISS
Lucyna Gorges at a standing table overlooking the factory hall

Guide

Practical Lean guide

27 of 40 articles

Laminated process chart on a pinboard with a handwritten note stuck over itOffice and digitalisation

The manual says A, the plant does B. Who is right?

In almost every company there is a gap between the documented process and the lived process. Whoever ignores it digitises the wrong thing. Whoever takes it seriously often finds the best process in everyday work.7 min
Department manager's desk in a glass office above the production hall between a strategy paper and shift reportsChange and leadership

Why change gets stuck in middle management

The executive board has decided, the line is waiting, and in between sits the level that is supposed to carry everything and gets the least for it. Why that is and how to turn the middle into the engine.7 min
Project wall full of sticky notes, a hand crossing out one projectStrategy and approach

Ten projects at once is not a strategy

When everything runs at once, nothing gets finished. I show how to sort projects honestly, cut visibly and still keep the people who got involved.7 min
Cleared desk in the plant administration with one last binderChange and leadership

When your lean manager resigns, more than one person leaves

The lean manager resigns, and suddenly the plant realises that everything depended on him. How to move knowledge from heads into structures before it is too late.7 min
Group of operators with crossed arms at a shift meetingChange and leadership

When the team pushes back, it is usually right

Whoever fights resistance loses the people they need. Whoever reads it finds the flaw in the initiative. A practical guide for plant managers and department heads.7 min
Standard work sheet at a workstation next to a handwritten noteLean in practice

The poster on the line has never improved a process

The standard hangs laminated on the machine, the work is done differently. I explain why standards die, what boards can and cannot do, and how to build standards that last.7 min
Wall clock next to a shopfloor board in the early morningLean in practice

Fifteen minutes in the morning that save the whole day

Many boards are up, few have an effect. The difference lies in the format, not the board. How to build a daily meeting that makes deviations visible and forces actions.7 min
Hands searching for a tool in an unsorted drawer in front of an open machineLean in practice

Changeover time starts long before the first move

The machine is stopped, the setter is looking for the tool, the drawing is missing, the crane is busy. Changeover time is rarely lost at the machine. It is lost beforehand. Here is how to find those losses.7 min
Clipboard with an empty radar chart above the production hallStrategy and approach

How mature is your plant really? An honest self-test

Every plant manager has a picture of how good their plant is. It is rarely accurate. A maturity check replaces gut feeling with a shared, verifiable assessment of where you stand.7 min
Lucyna Gorges facilitating a lean workshop in the obeya room of a large plant

Would you rather discuss your initiative than keep reading?